Building Permit in Marbella

First, we need to know what you want to do
Building permit in Marbella

If you are thinking about building a villa, extending a home or carrying out a renovation in Marbella, one of the first questions you need to answer is what authorisation the project requires.

And it is best to answer it before you start designing.

The type of work, the characteristics of the home, the plot and the applicable regulations determine how each project has to be processed.

At The Villas Architect we study the planning feasibility of the project, prepare the necessary technical documentation and guide you through the application, so that the permit is not a formality that appears at the end, when many decisions have already been made.

First, we need to know what you want to do.

Then we will check how it can be done.

Drawings and a model during the design of a home
Which permit

What permit do I need for building work in Marbella?

Not all building work is processed in the same way.

Building a new home does not have the same implications as changing an interior layout, extending an existing villa or carrying out work that affects its structure.

That is why, before talking about documents or timescales, the scope of the work has to be properly defined.

Depending on the characteristics of the project, it may require a planning permit or be processed through other procedures provided for certain types of work.

The important thing is not to start with the application form.

You have to start with the project.

Major works

Major works permit in Marbella

Building a new villa and certain substantial interventions on existing buildings require a technical project and the corresponding planning application.

In these cases, the architect’s work starts long before the documents are submitted.

The plot or existing building has to be studied, the planning conditions checked, a proposal developed that complies with the regulations, and the technical project prepared to apply for the corresponding authorisation.

The better that groundwork is done, the less uncertainty there will be during the application.

If you would like more detail on timescales, fees and the current planning situation, see our guide to the major building permit in Marbella: timelines, fees and PGOM.

Minor works

Minor works permits and other interventions

Not every renovation has to follow the same procedure as a new build.

Marbella Town Council provides for different forms of administrative control depending on the type and scope of the work.

So it is not wise to assume that a project needs a particular permit just because it looks like small-scale work.

Before starting, we study the work you want to carry out and determine which documents and procedure apply in your case.

An interior renovation, an exterior intervention or a change to certain elements of the home may have different requirements.

Sorting this out before you start avoids problems later.

José Manuel Garrido reviewing drawings during a site visit
Responsible declaration

Responsible declaration (declaración responsable) for building work in Marbella

Certain types of work can be processed through a responsible declaration when they meet the requirements established for this procedure.

That does not mean any work can begin simply by submitting a document.

The work must fall within the corresponding cases and comply with the applicable planning and technical regulations.

That is why, even when the administrative procedure is simpler, it is important to check the feasibility of the intervention beforehand and to prepare the necessary documentation properly.

Administrative speed is no substitute for technical work.

Architect visiting a plot before designing
Feasibility

Before applying for a permit, we check what can be done

Imagine you buy a villa intending to extend it.

You want to increase the interior floor area, change part of the façade and completely reorganise the main floor.

Before designing that extension, we need to know whether there is planning headroom to do it.

How much buildability has already been used? What is the site coverage? Are there setbacks we must respect? Is there any specific constraint on that property?

The same applies to a plot where you want to build from scratch.

The design has to start from the real possibilities of the property.

That is why planning feasibility is one of the first stages of our work.

Technical project

Technical project to apply for a building permit

When the work requires an architectural project, we prepare the documentation needed to define it and demonstrate compliance with the regulations.

The project does not exist only to obtain a permit.

It is the document that turns an idea into something that can be studied, authorised and then built.

Layout, floor areas, structure, installations, building envelope, materials and construction solutions are defined progressively until they reach the level of detail each phase requires.

Our job is to make design, regulations and construction move in the same direction.

Timescales

How long does a building permit take in Marbella?

It is one of the questions we are asked most often.

And also one that needs context.

The timescale depends on the procedure, the characteristics of the project, the documents submitted, any requests for further information and the specific circumstances of each application.

That is why we prefer not to give a universal date that is unlikely to hold for every project.

When we study your case, we can identify which procedure applies, what documentation we will need and how to fit the application into the overall project schedule.

The application period can also be used to keep developing aspects of the future construction.

The permit should not mean putting the project on hold.

Costs

How much does a building permit cost?

The cost of the application is not a fixed amount for every project either.

It may depend on the type of work, the construction budget and the taxes, fees and other items that apply in each case.

In a villa of a certain size, these items should be part of the budget from the early stages.

It makes no sense to calculate how much you want to invest in construction alone and only later discover all the costs associated with the project, the technical work and the authorisations.

That is why we try to give the client a more complete view of the investment before construction starts.

New build

Permit to build a villa in Marbella

If you are building from scratch, the permit is only one part of a much larger process.

First, the plot has to be studied and the project developed.

Then come construction, site management and the procedures needed before the home can be occupied.

Our work is not just about preparing documents and disappearing once the permit is granted.

We can support you from the initial study of the plot until the home is finished.

This means planning, architectural and construction decisions are made as parts of the same project.

More information: architect for custom homes in Marbella.

Flamingos 94 villa with pool in Benahavís
Interior gallery with dining area and plants at Torrejón 50, Estepona
Renovation

Permit for a full renovation in Marbella

When we work on an existing home, we need to study both what you want to change and the current condition of the property.

Changing finishes does not involve the same requirements as altering the structure, increasing the floor area or intervening on certain exterior elements.

That is why the scope of the renovation has to be defined before deciding how it will be processed.

If you are considering completely transforming a villa, we can study the property, develop the renovation project and take care of the technical documentation needed to take it to construction.

More information: full renovation in Marbella.

Before you buy

Thinking of buying a plot or a villa to renovate?

There is a moment when an architect can save you a lot of trouble and no project exists yet.

Before you buy.

If you are considering a plot to build on or a villa you intend to transform, knowing its planning constraints in advance can completely change the decision.

A large plot does not necessarily mean you can build the house you imagine.

And an existing villa may already have used up much of the plot’s building potential.

Studying it before closing the deal allows you to decide with far more information.

That is what our preliminary study is for: we review the property’s documents, its planning status and what the plot allows, and explain the results to you before you sign. More about our planning feasibility study.

AFO status

Older villas with AFO status (asimilado a fuera de ordenación)

Many villas on the Costa del Sol were built decades ago, and not all of them were built with a permit or match what current planning allows. When it is no longer possible to take action against those works because the legal deadline has passed, the building may be classed as asimilado a fuera de ordenación (AFO).

AFO status does not legalise the building. What its recognition by the Town Council does allow, among other things, is to regularise the property at the Land Registry and to connect basic utilities.

It also limits what can be done afterwards. In a building with AFO status, generally only the works needed to preserve it and keep it in use are allowed; an extension or a major renovation may not be possible.

That is why, before buying or commissioning a renovation project, it is worth knowing whether the villa is fully compliant, has AFO status or should have it. We review the property’s documents, compare what has been built with what was authorised and explain how much real scope there is to intervene.

If you are buying, this analysis can change the price or the decision. If you already own the villa, it tells you which renovation is viable before you invest in a project.

International clients

Building permits for international owners

If you live outside Spain, terms such as planning permit, basic project, responsible declaration or municipal regulations are probably not the part of the project you are most excited to learn about.

And you do not need to become an expert in them.

We are used to working with international clients who build or renovate their home in Marbella while continuing to live in another country.

We explain the decisions that really affect the project and take care of the technical and administrative work needed throughout the process.

You need to understand what is happening.

Not learn how to handle the application yourself.

Project meeting reviewing plans on a tablet
Frequently asked questions

Frequently asked questions about building permits in Marbella

It depends on the work to be carried out. The scope of the intervention determines which procedure and documentation apply. That is why it is best to study the renovation before starting work.

It depends on the type of work. Interventions that require an architectural project need the involvement of a qualified professional. For a new-build villa, the architect develops the project needed to define the home and apply for its authorisation.

The difference relates to the nature and scope of the intervention and the applicable procedure. A new-build home and certain substantial renovations require a different process from smaller-scale work.

It is one of the instruments provided for certain types of building work that meet the requirements established for this procedure. Before using it, it must be confirmed that the specific work can be processed this way.

The documentation required depends on the procedure and the stage of the project. For work that requires an architectural project, the technical development needed to apply for the corresponding authorisation must be in place.

It depends on the project and on items such as the construction budget on which certain taxes and fees are calculated. It is best to include these costs in the overall financial estimate from the early stages.

There is no identical real timescale for every application. It depends on the type of work, its complexity, the documents submitted and any requests for further information during the process.

Yes. In fact, it is advisable to analyse the planning constraints before acquiring a plot if the purchase depends on being able to carry out a particular project on it.

What our clients say
Client testimonials

"José Manuel really did an excellent job. We felt we were on the same page. He understood what we wanted and designed it."

Johan and Camino W.
Johan and Camino W.

"José Manuel is professional, on time, always open to study and accept any proposal we present to him".

Jesús L. and Isabel Y.
Jesus L. and Isabel Y.

"I would not hesitate to recommend him to anyone looking for an architect who can combine creativity with exceptional project management skills."

Doreen M.
Doreen M.
Your project

Before applying for a permit, let’s talk about what you want to do

You may already have a plot.

You may want to renovate a villa.

Or perhaps you are about to buy a property and want to know whether you will really be able to transform it the way you imagine.

Tell us where you are.

We will study the project and its constraints to work out what the next step should be.